Skip to main content

Here's why speed limits on some B.C. highways have been reduced

Share
Vancouver -

B.C.'s Ministry of Transportation says it has reduced speeds on several highways to lessen the risk of damage due to flooding.

The ministry says in a tweet that some highways are given 60 kilometre-per-hour speed limits due to ground saturation.

Because of storms, it says the ground under the road could be soft and travelling at higher speeds is more likely to cause damage.

Several highways were destroyed by storms two weeks ago and others were closed over the weekend as a precaution or due to localized flooding.

CTVNews.ca Top Stories

Notre Dame Cathedral: Sneak peek ahead of the reopening

After more than five years of frenetic reconstruction work, Notre Dame Cathedral showed its new self to the world Friday, with rebuilt soaring ceilings and creamy good-as-new stonework erasing somber memories of its devastating fire in 2019.

Stay Connected