Skip to main content

B.C. highway report: Route closed in both directions due to mudslides

DriveBC says Highway 1 is closed between Spences Bridge and Lytton. (DriveBC/Twitter) DriveBC says Highway 1 is closed between Spences Bridge and Lytton. (DriveBC/Twitter)
Share

A stretch of B.C. highway was closed overnight in both directions due to mudslides in the area.

The province's Transportation Ministry said Highway 1 was closed between Highway 12 and Highway 8, between Spences Bridge and Lytton, with no detour available.

The first notice was shared at about 9:30 p.m. Wednesday. Thursday morning, the alert remained in place with officials saying a "slope assessment will occur at first light."

Highway 1 through the Fraser Canyon has been undergoing major repairs over several months following a series of storms last November.

While the route between Hope and Spences Bridge eventually reopened, travellers were warned to expect significant delays and changes to traffic patterns.

The route has also face temporary closures, like in June when the section of Highway 1 between Lytton and Spences Bridge was proactively closed due to forecasted rain and the potential for debris.

A request for proposals to complete permanent repairs along the route is open until Sept. 14. 

CTVNews.ca Top Stories

BREAKING

BREAKING Honda to get up to $5B in govt help for EV battery, assembly plants

Honda is set to build an electric vehicle battery plant next to its Alliston, Ont., assembly plant, which it is retooling to produce fully electric vehicles, all part of a $15-billion project that is expected to include up to $5 billion in public money.

Secret $70M Lotto Max winners break their silence

During a special winner celebration near their hometown, Doug and Enid shared the story of how they discovered they were holding a Lotto Max ticket worth $70 million and how they kept this huge secret for so long.

Stay Connected